EngРусTürk

Planned maintenance TurkStream from 22 until 29 June

16 June 2021

Amsterdam, 16.06.2021

Gas transmission through both offshore lines of TurkStream will be temporarily halted from 22 June until 29 June 2021. The shutdown is related to annual planned maintenance and basic diagnostic works. The works will be carried out by South Stream Transport B.V., the operator of the offshore pipeline system.

Media Office

media@turkstream.info
+31 20 262 45 45